CoimbatoreOn-siteDirector
Applicants who checked fit first are 3.1× more likely to hear back
On-site in Coimbatore.
OK with that?Director level, usually 12-15 years.
You have them?No pay range in the post.
Not a repost. 8 of Larsen & Toubro's last 1157 posts were reposts; 32 of its 1063 open roles are here.
13 Quality Assurance Engineer roles posted in Coimbatore this week, 212 open. See them →
Skills listed in the post · tap the ones you have · 0 of 8
You almost certainly match several of these already.
This post sets 2 stated bars and lists 8 skills. Tap where you stand - nothing is saved, no account needed.
ASAI checks this on every job for you, automatically, so you apply where you fit.
How an ASAI match score looks. Yours is built from your resume, not a guess.
Your score for this role already exists - sign in to view it
ASAI compared this JD against 41 signals - skills, seniority, domain, stack overlap etc. Add a resume and it unlocks in about 30 seconds.
Always free · no credit card · 1 tap with Google
Starts free · 60-Day Pass ₹149 for 60 days, GST included
Free account, no card needed.
S. No. | Roles & Responsibilities |
|---|---|
1 | Lead the overall Quality function across SMT, THT, PCBA Testing, Conformal Coating, and FATP/Box Build operations. |
2 | Establish and maintain QMS in compliance with ISO 9001, IATF 16949, and customer-specific requirements. |
3 | Drive customer quality, complaint management, 8D reports, corrective actions, and customer satisfaction. |
4 | Ensure effective implementation of IQC, IPQC, OQC, and supplier quality assurance processes. |
5 | Lead NPI quality planning, engineering builds, process validation, APQP, PPAP, FMEA, and control plans, as applicable. |
6 | Monitor manufacturing quality, defect trends, process capability, yield, and product reliability. |
7 | Drive root cause analysis using 8D, 5-Why, Fishbone, SPC, and CAPA methodologies. |
8 | Lead supplier quality improvement, supplier audits, incoming defect reduction, and supplier corrective actions. |
9 | Ensure compliance with IPC-A-610, J-STD-001, ESD control requirements, and applicable workmanship standards. |
10 | Establish quality dashboards and conduct periodic reviews of quality KPIs with Production, Engineering, SCM, and Management. |
11 | Lead internal audits, customer audits, certification audits, and timely closure of audit findings. |
12 | Ensure product traceability, inspection records, defect tracking, and quality data integrity through MES/SAP systems. |
13 | Develop quality team competency, training plans, skill matrices, and inspection standards. |
14 | Drive continuous improvement, defect prevention, cost-of-poor-quality reduction, and process standardization. |
15 | Build a zero-defect culture and ensure consistent delivery of conforming products in line with customer requirements. |
S. No. | KPI | Measurement | Suggested Target |
|---|---|---|---|
1 | First Pass Yield (FPY) | Percentage of units passing without rework | ≥ 98% |
2 | Customer PPM | Customer defects per million units | As per customer target |
3 | Internal Defect Rate | Defective units / total units produced | Continuous reduction |
4 | Customer Complaint Closure | Complaints closed within agreed timeline | 100% on time |
5 | CAPA Effectiveness | Corrective actions effective and verified | ≥ 95% |
6 | Supplier PPM | Incoming supplier defects per million units | As per supplier target |
7 | Incoming Quality Acceptance | Incoming lots accepted against defined criteria | ≥ 98% |
8 | COPQ Reduction | Cost of Poor Quality reduction | 10–15% annual reduction |
9 | Audit Compliance | Major non-conformities and audit action closure | 100% closure within due date |
10 | NPI Quality Readiness | Quality deliverables completed before production release | 100% |
11 | Rework and Scrap | Rework/scrap cost as a percentage of production value | Continuous reduction |
12 | Quality Training Compliance | Completion of planned quality training | 100% |
13 | Traceability Compliance | Product and process records complete and retrievable | 100% |
14 | Process Audit Compliance | Planned audits completed as per schedule | 100% |
15 | Zero-Defect Improvement | Reduction in repeat defects and critical escapes | Zero critical escapes; continuous improvement |
Get tomorrow's jobs before you have to search