HyderabadOn-siteMid Level
Applicants who checked fit first are 3.1× more likely to hear back
On-site in Hyderabad.
OK with that?2-6 years asked. Quality Assurance Engineer roles in Hyderabad usually ask 3-5; almost all ask 2+.
You have them?No pay range in the post.
Not a repost. 2 of Cyient's last 77 posts were reposts; 31 of its 73 open roles are here.
223 Quality Assurance Engineer roles posted in Hyderabad this week, 1,798 open. See them →
Skills listed in the post · tap the ones you have · 0 of 8
You almost certainly match several of these already.
This post sets 2 stated bars and lists 8 skills. Tap where you stand - nothing is saved, no account needed.
ASAI checks this on every job for you, automatically, so you apply where you fit.
How an ASAI match score looks. Yours is built from your resume, not a guess.
Your score for this role already exists - sign in to view it
ASAI compared this JD against 41 signals - skills, seniority, domain, stack overlap etc. Add a resume and it unlocks in about 30 seconds.
Always free · no credit card · 1 tap with Google
Starts free · 60-Day Pass ₹149 for 60 days, GST included
Free account, no card needed.
Having 2-6 years of experience in,
• Developing Control Logics in DCS\PLC systems based on SAMA sheets & control narratives (preferably those that may have experience programming in a Function Block Diagram environment).
• Developing Graphics in DCS\PLC HMI systems based on P&IDs and graphic specifications.
• Preparation of Control test cases/Instructions and perform logic & graphics testing.
• Review of Functional requirements, generation of System Design Specification, preparing of Technical Reports & Generate Requirement Traceability Matrix.
• Capture functional requirements from the design documents.
• System Engineering & Cabinet Engineering
• In DCS hardware engineering, you'll design, install, and maintain the physical components like controllers and I/O modules. You'll troubleshoot hardware issues, configure networks, and ensure the system functions flawlessly to control industrial processes
• Created Macros, Control Logic sheets, and HMI screens based on functional requirements.
• Test procedures developed for logic and graphics testing.
• Performed engineering, CTE, & functional testing for Macros, Logic, & HMI screens.
• Test reports created to demonstrate compliance with functional requirements.
• Capable of studying and modifying Control Narratives, Functional Logic Diagrams, Cause & Effect Diagrams.
Note: Operations & Maintenance, Field Experience are not eligible
Functional Requirements, PLC Programming, Design Specifications, Hardware Engineering, Distributed Control System (DCS), Logic Diagrams
Control and Instrumentation engineer having 2-6 years of experience in the field of Instrumentation and control with complete engineering background. Candidate must have exposure to complete I&C life cycle and can independently author as well as review the Instrumentation deliverables. Typically requires a bachelor's degree in engineering in related Instrumentation field.
Functional Requirements, PLC Programming, Design Specifications, Hardware Engineering, Distributed Control System (DCS), Logic Diagrams
Associate
Get tomorrow's jobs before you have to search