HyderabadOn-siteMid Level
Applicants who checked fit first are 3.1× more likely to hear back
On-site in Hyderabad.
OK with that?Mid Level level, usually 3-5 years.
You have them?No pay range in the post.
Not a repost. 8 of Larsen & Toubro's last 1157 posts were reposts; 57 of its 1063 open roles are here.
223 Quality Assurance Engineer roles posted in Hyderabad this week, 1,798 open. See them →
This post sets 2 stated bars. Tap where you stand - nothing is saved, no account needed.
ASAI checks this on every job for you, automatically, so you apply where you fit.
How an ASAI match score looks. Yours is built from your resume, not a guess.
Your score for this role already exists - sign in to view it
ASAI compared this JD against 41 signals - skills, seniority, domain, stack overlap etc. Add a resume and it unlocks in about 30 seconds.
Always free · no credit card · 1 tap with Google
Starts free · 60-Day Pass ₹149 for 60 days, GST included
Free account, no card needed.
Engineer – Formwork – Site is responsible for end-to-end planning, supervision, and execution of formwork activities at the project site. The role ensures timely, safe, and quality erection, dismantling, and reuse of formwork systems in line with structural drawings and construction schedules. The incumbent manages formwork teams, coordinates with engineering, procurement, and safety departments, and ensures cost-effective use of materials and labour to meet the project's formwork cycle and productivity targets.
Plan and manage end-of-end site formwork activities including layout, erection, alignment, dismantling, and reuse of formwork systems. ? Interpret formwork and structural drawings to ensure accurate and safe implementation on-site. ? Supervise the erection and de-shuttering of formwork for slabs, beams, columns, walls, and other structural elements. ? Coordinate with project engineers, structural and planning teams to align formwork cycle with construction schedules. ? Ensure adherence to safety, quality, and engineering standards during all formwork activities. ? Monitor and optimize formwork cycle time, material utilization, and manpower deployment.
Get tomorrow's jobs before you have to search